In Antakya, old directions to an address may no longer lead to the same street today, since rebuilding is still under way in the region. For a family moving to Hatay, the first step in the plan is finding out the current state of the destination address.
Seen from Istanbul, this province at the eastern end of the Mediterranean, near the Syrian border, counts as a long-distance move. The road from Maltepe to Antakya is about 1,095 km, roughly 11 hours of driving. The truck crosses Anatolia heading south, and in the final section follows the shore of the Gulf of İskenderun before descending to Antakya via Belen. The Amanos Mountains run parallel to the coast, and the Belen pass is steep and winding, so a loaded truck slows down here. With breaks and rest stops, the move can span two days; the delivery date is set in writing from the start.
The street as it is today
Newly built and renovated homes stand alongside older apartment buildings. We get detailed information from you on the current state of the street, the building entrance and the elevator, and confirm it once more before the move. The narrow streets of Antakya's historic quarter can limit a large truck; if needed, your belongings are transferred by a smaller vehicle.
If the address is in İskenderun, Defne or Samandağ, the distance and arrival time are calculated for that address. Heavy traffic along the gulf coast also affects the unloading time, so the truck's departure time from Istanbul is set accordingly.

Wood and fabric in humid heat
Summers in Hatay are long, hot and humid; winters are mild and rainy. Humidity affects wooden furniture, textiles, books and electronic devices, so we use extra protection for them. Summer unloading is moved to early morning or late afternoon. At the new home, leaving boxes for a long time in a closed, hot room is not good for your belongings; airing the rooms during the first days helps.
Over the length of the road, your belongings vibrate for hours. Boxes are loaded by weight and labeled with room information, large furniture is disassembled, and glass and screens travel in special packaging. We discuss the value of valuable items and the insurance coverage separately during the survey.
Handover dates in newly built buildings
Key handover in newly built buildings is sometimes delayed. In that case, your belongings can wait in our storage service; if we know about the need from the start, the move and storage run in the same plan.
Notes before your move
- If you are moving into a newly built building, confirm before delivery that the elevator is working.
- When describing the address, send a location link as well.
- If you may need storage, tell us the estimated handover date of your new home at the first meeting.
- Point out fabric sofas that could be affected by humidity during the survey.
Frequently asked questions
There's construction on the street we're moving to. Will the truck be able to get in?
If you can find out what hours the work takes place and whether the machinery blocks the road, we schedule unloading for when the work stops. If the road is fully closed, your belongings are carried from the nearest suitable point.
We're moving to a house in Samandağ. What should we write on the form?
Write the district, the neighborhood, the floor of the building and whether there is an elevator. The distance is calculated separately from Antakya.
Which months are easiest for moving to Hatay?
Because winters are mild, both the crew and your belongings are under less strain from October to May. We move in the summer months too; then we schedule unloading for the coolest part of the day.