Office Relocation
In office and high-rise moves, we number desks, cabinets, archives and IT equipment and match them to the new layout plan. If needed, we do the work outside business hours or on the weekend.

What does Office Relocation include?
- Office and high-rise moves
- Archives, servers and electronic equipment
- A layout plan for the new office
- After-hours and weekend moves
- Numbered desks and cabinets
- Insured moving
In an office move, our goal is for the computer shut down at the old office on Friday evening to start up at the new desk on Monday morning. In this kind of move, the workflow and information change places along with the furniture. We build the plan so that staff can pick up on Monday where they left off.
A number for every desk
During the survey, we look at the office's current layout, the number of staff, the amount of archive material and equipment, and the differences between the two buildings. We get the layout plan for the new office from you or work it out with you. Then every desk, cabinet, chair and device is numbered, and its place in the new office is marked on the plan. On moving day, the crew knows where each piece goes, and every employee finds their desk in place.
We can also do a preliminary review from photos of the office or a floor sketch. If your moving date is set, requesting a survey early gives you time to prepare.

Servers, computers and confidential documents
Computers, servers, printers and network devices are moved in anti-static, shock-absorbing packing, and cables are labeled, so reconnecting the devices at the new office takes little time. For devices that hold data, we recommend making a backup before the move, having your IT manager with us on moving day, and moving the devices under a documented record. Setting up the IT equipment at the new office is also done together with this person. Cabinets containing confidential documents are moved closed and labeled.
Hours when work does not stop
The first question is usually how long work will stop. We can schedule the move outside business hours, overnight or on the weekend. In large offices, the work is split by floor or department, so the rest keep working while one section moves. In high-rises, the freight elevator, parking and access hours are subject to the building management's rules. We obtain permissions such as the moving time, the elevator reservation and access cards from the management in advance.
A new office often comes with new furniture. If some of the old desks will no longer be used, putting them into storage or sending them to another address can be added to the same plan. Transferring equipment between branches and moving archives and documents can also be done as part of this job.
- Free surveyOn-site or by video
- Written contractScope and date on record
- Insured movingFrom loading to delivery
What we ask of your staff
Moving day goes faster if, a few days beforehand, everyone sets aside the personal items, medicines and valuable documents in their desks and gets their drawers ready for packing. When the crew packs the contents of desks, they use a separate label for each drawer and compartment, so each employee can go straight to their own box at the new office.
At the new office, the numbered items are placed according to the plan: desks are assembled, cabinets are set up and archive boxes are left in their assigned area. Every move, from a small office to a high-rise, is insured.
Service types
The office moving process
- 1Survey and inventory
We see the workspace, equipment and archives in person and list them.
- 2Numbering and layout plan
Desks, cabinets and equipment are numbered, and their places in the new office are marked on the plan.
- 3After-hours moving
If you prefer, the move is scheduled for the evening or the weekend so your work is not disrupted.
- 4Setup and placement
Items are placed where the plan shows, and desks and cabinets are assembled.
Frequently asked questions
How long does an office move take?
A small office and a high-rise moving several floors do not take the same amount of time. The duration depends on the number of staff, the size of the archive, and the elevator and access rules of both buildings. After the survey, we give you a plan broken down by the hour.
How are computers and servers packed?
Each device is wrapped individually to protect it from impact and static electricity. Cables are marked for their device, so reconnecting at the new desk takes little time. What protects your data, however, is a backup made before the move.
Can we schedule the move for the weekend?
Yes. We can set up a plan that starts Friday evening and is finished by Monday morning. In a high-rise, we get the management's permission for weekend access in advance.
Do we have to move the whole office in one day?
No. The work can be spread over several days, department by department. Departments that are not yet scheduled keep working in their old space, and we agree on the order with you.
Do we need permission from the building management in a high-rise?
Yes. We handle that correspondence, and the time window the management gives us determines the moving plan.